A watched sweater never blocks (or something)

The sleeves are done and blocking and still damp. I keep wanting to go in there with a hair dryer, but I know better! I'm so close to having Grant's sweater done -- and he's been going to work in sweaters this week, because it's been so cold! Aaaaaaaa!

I said before I was going to use all that lovely Cobblestone Heather we bought for a sweater for me, but screw that. If he's willing to wear sweaters I make after all this time, I am so knitting him another one.

I originally had -- I thought -- sixteen balls of Merlot Heather. I have 12 ball bands for sure from used balls, and there's a half-ball left with which I'll be doing the neckline and sewing seams, plus two full balls after that. That makes 15 -- which means either one ball has gone entirely missing, or I tossed a ball band before I realized I wanted to hang on to them for easy yarn tracking (which is more than possible). I'm going to assume that I did, in fact, use up that missing ball, which means I have now used 13.5 balls of yarn on this sweater, or nearly 14 balls (nearly 1722 yards) of DK-weight yarn by the time I'm through. Whoa. That's a lot of yarn! Almost a mile! You can imagine I'm pretty thrilled about what this does to my stash totals (using up nearly 700g for a single sweater = WIN).

It does leave me with a little extra yarn, with which I'll probably make a hat of some kind. :) But not until after I finish most of those mystery projects. Man, there are a lot.

Leave a Reply